How to become an operations consultant: what you need to learn

Operations consulting is the most down-to-earth discipline in consulting: processes, lead times, inventories, procurement, costs. This is where it is decided whether a company delivers efficiently. This path takes you in five stages from the basics of process analysis to cost programmes that do not creep back after two years.

Who it is for
For consultants, engineers and controllers who want to work on operations and cost projects.
Duration
About 3 to 5 months, ideally with visits to real plants or warehouses.

0 of 6 modules completed

How the path works: work through the modules in order. Each module is a learning page of its own with an explanation, a practical example, typical mistakes, an exercise and three self-check questions, plus a 30-question test. Mark a module as completed once you can answer the questions with confidence. Your progress is stored only in this browser; you do not need an account.

The 6 modules

  1. 01 Seeing processes: value stream, lead time, Little’s Law

    How to make a process visible from customer order to delivery, measure lead time and inventory, and why Little’s Law applies almost everywhere.

    10 minutes · completed ✓
  2. 02 Lean: recognising waste and creating flow

    The five lean principles according to Womack and Jones, Ohno’s seven types of waste, and what pull, flow and continuous improvement mean.

    11 minutes · completed ✓
  3. 03 Managing bottlenecks: the Theory of Constraints

    Why the bottleneck determines the throughput of the whole system, how Goldratt’s five focusing steps work and what drum, buffer and rope mean.

    10 minutes · completed ✓
  4. 04 Quality and Six Sigma

    How to solve quality problems in a structured way, what DMAIC and PDCA mean, how to find root causes and when Six Sigma is the right tool.

    10 minutes · completed ✓
  5. 05 Procurement and reducing indirect costs

    How to analyse spending, classify categories with the Kraljic matrix and reduce indirect costs through price, demand and specification.

    10 minutes · completed ✓
  6. 06 Supply chain, inventory and planning

    Why inventory ties up money and is still necessary, what the bullwhip effect is, how ABC/XYZ analyses help and how sales and operations planning connects sales and production.

    11 minutes · completed ✓

Overview in 5 stages

  1. 01

    Foundations

    Learning to see processes

    Learning goal: You can map a process and show where time and money are lost.

    The basic idea of lean comes from the Toyota Production System and became known in the West through “The Machine That Changed the World” by Womack, Jones and Roos. It is simple: everything the customer would not pay for is waste. Waiting, transport, inventory, rework, unnecessary motion.

    The most important tool is value stream mapping. You follow a product or order from receipt to delivery and measure how much of the time actually creates value. The result almost always surprises: often it is only a few percent, and the rest is lying idle and waiting.

    What you need to be able to do

    • Map a value stream on site, not just from data.
    • Distinguish value-adding from non-value-adding time.
    • Name the biggest waiting times and inventories.

    Exercise

    Follow a process in your own surroundings, such as an order or a holiday request, from start to finish. How much of the total time was actually spent working on it?

    Self-checkAn order takes 20 days, and it is worked on for 4 hours in total. What follows from this?

    Less than one percent of the lead time creates value. The lever is not working faster but shortening waiting and idle times, for example through smaller batches, fewer hand-overs and clear priorities.

  2. 02

    Building

    Finding and resolving bottlenecks

    Learning goal: You can determine the bottleneck of a system and explain why improvements elsewhere achieve nothing.

    In his novel “The Goal”, Eliyahu Goldratt popularised a simple truth: a system is only as fast as its bottleneck. Every hour lost at the bottleneck is lost for the whole system. Every improvement anywhere else only increases the inventory in front of the bottleneck. The Theory of Constraints describes five steps: identify, exploit, subordinate everything else, elevate, start again.

    Linked to this is a relationship every operations consultant should know: Little’s Law. The inventory in the system equals throughput times lead time. If you reduce inventory at the same throughput, you automatically reduce lead time.

    What you need to be able to do

    • Find the bottleneck in a process through inventories and utilisation.
    • Apply the five steps of the Theory of Constraints.
    • Link inventory, throughput and lead time with Little’s Law.

    Exercise

    A line has four stations producing 60, 45, 70 and 50 parts per hour. Where is the bottleneck, how much does the line produce, and what happens if you raise station 3 to 90?

    Self-checkA warehouse holds 600 orders, and 100 are completed per day. What is the average lead time?

    According to Little’s Law: lead time = inventory divided by throughput = 600 / 100 = 6 days.

  3. 03

    Building

    Procurement and indirect costs

    Learning goal: You can analyse a procurement volume and prioritise the biggest levers.

    In many industrial companies, procurement is the largest cost block, often more than half of revenue. The starting point is a spend cube: all spending by category, supplier and business unit. This view alone often reveals fragmented volumes, duplicate suppliers and spending without a contract.

    The levers divide into commercial and technical ones. Commercial: bundle, tender, renegotiate. Technical: simplify specifications, reduce variants, question demand. The technical levers are harder, but they last longer.

    What you need to be able to do

    • Build a spend cube from accounts payable data.
    • Prioritise categories by volume and lever.
    • Distinguish commercial and technical levers.

    Exercise

    Sort a list of expenses by supplier and calculate how many suppliers account for 80 percent of the volume. Where do you buy the same thing from several suppliers?

    Self-checkWhy do technical procurement levers often have a more lasting effect than renegotiations?

    Because they change the demand itself, for example through simpler specifications or fewer variants. A renegotiated price can rise again next year; a simplified part stays cheaper.

  4. 04

    Deepening

    Setting up cost programmes

    Learning goal: You can set up a cost programme with a robust target and measurable measures.

    A cost programme starts with the question of how much needs to be saved and why. The basis is a clean baseline: costs by function and cost type, compared with competitors. Zero-based budgeting goes further and asks of every expense whether you would approve it again today.

    For administrative functions, spans and layers help: how many employees does each manager lead, and how many levels are there? Spans of control that are too small and too many levels make organisations slow and expensive. Every measure needs an owner, a date and a measurement in the profit and loss statement.

    What you need to be able to do

    • Build a cost base by function and cost type and benchmark it.
    • Use zero-based budgeting to have spending justified afresh.
    • Define measures so that their effect on the result is measurable.

    Exercise

    Take a department budget and justify every item as if it did not yet exist. Which ones would you no longer approve today?

    Self-checkWhat is the difference between traditional budgeting and zero-based budgeting?

    Traditionally, the previous year is rolled forward and adjusted by percentages. In zero-based budgeting, every expense must be justified afresh, as if it were being approved for the first time.

  5. 05

    Expert

    Making savings last

    Learning goal: You can prevent costs from coming back after the programme.

    Many cost programmes reach their target, and two years later the costs are back. The reason: spending was cut, but not the work that causes it. Anyone who cuts ten percent of positions without cutting tasks, reports and coordination only redistributes the work until new positions appear.

    Professionals therefore anchor savings in structures: in the budgeting process, in approval limits, in metrics, in simplified processes. And they pay attention to Chesterton’s fence: before a rule or control is removed, you need to know why it is there.

    What you need to be able to do

    • Derive measures from reducing work rather than simply cutting positions.
    • Anchor savings in the budgeting process and in metrics.
    • Set up tracking that shows relapses early.

    Exercise

    Take a completed cost programme from your surroundings and check after a year: which savings are still there, which have come back, and why?

    Self-checkWhy do costs come back after many programmes?

    Because spending was cut, not the work that causes it. Without changed processes, tasks and rules, the need arises again, and the costs with it.

Amazon links on English pages carry no affiliate tag.

+Frequently asked questions

What do I need to learn as an operations consultant?

Analysing processes with lean and value stream mapping, resolving bottlenecks with the Theory of Constraints, evaluating procurement volumes, setting up cost programmes and anchoring savings for the long term.

Which book on operations should I read first?

“The Goal” by Eliyahu Goldratt. It is a novel and explains bottlenecks and throughput so vividly that you can understand it in a weekend.

What is Little’s Law?

A relationship from queueing theory: inventory = throughput × lead time. If you reduce inventory at the same throughput, you reduce lead time.

+Next

How to cite this page

APA (7th edition)

Benchreads. (2026). How to become an operations consultant: what you need to learn. Retrieved 25 November 2026, from https://benchreads.com/en/learning-paths/become-an-operations-consultant/

Benchreads is a secondary source. For academic work, also cite the original sources named in the text. You are welcome to link to this page in course materials.

Last updated: 25 November 2026. Carefully researched, but without guarantee. Not legal, tax or investment advice. Disclaimer