What it looks like in a project
A corporate loan application takes 23 days. The value stream map shows 4 hours of processing. The rest is time spent waiting between seven desks. Two desks are merged and the lead time falls to 6 days.
VSM
Making the flow of material and information visible and finding waste.
Value stream mapping traces a process from customer order to delivery, with processing and waiting times. It almost always shows that the actual processing makes up only a small part of the lead time. The rest is waiting, transport and rework. The method comes from the Toyota Production System.
OriginMike Rother and John Shook, “Learning to See”, 1998, based on the Toyota Production System.
Example
A corporate loan application takes 23 days. The value stream map shows 4 hours of processing. The rest is time spent waiting between seven desks. Two desks are merged and the lead time falls to 6 days.
Walk the process yourself (gemba) instead of reconstructing it in a workshop.
Measure processing time and lead time separately.
Draw a future-state value stream and derive the measures from it.
Optimising only the processing. The lever is almost always in the waiting times.
A lean method that maps the material and information flow of a process with processing and waiting times in order to identify waste.
APA (7th edition)
Benchreads. (2026). Value stream mapping: meaning, example and application. Retrieved 25 November 2026, from https://benchreads.com/en/glossary/value-stream-mapping/
Benchreads is a secondary source. For academic work, also cite the original sources named in the text. You are welcome to link to this page in course materials.
Last updated: 25 November 2026. Carefully researched, but without guarantee. Not legal, tax or investment advice. Disclaimer